PROJECTDevelopment and Application of Models and Guidelines for Decision Making Support to Upgrade and Increase the Existing WWTP Operating Efficiency. The Project was initiated as a part of the technical assistance component of the Inland Waters Project - Loan 7453/HR. Client: Hrvatske vode, Zagreb Completion year: 2011 |
PROJECTSewer system and wastewater treatment of the City of Samobor, Stage I - Sewer system development project. Project included set up and analysis of the feasible options, techno-economic analysis for selection of the most suitable option for waste water treatment, master plan of the sewer system Feasibility study, CBA, EIA and Application for EU funds. of Samobor agglomeration 49.750 PE. Client: Komunalac, Samobor Completion year: 2010 |
PROJECTPilot project of optimization of sewerage and waste water treatment systems on the example of the Town of Čakovec with the conceptual design of the network. Size of analysed area was 100.000 PE. Client: Hrvatske vode, Zagreb Completion year: 2010 |
PROJECTAdditional sewerage network in the area of Trogir city. Project consisted of conceptual design preliminary design for location permit issuing, detailed design, tender documentation for the sewerage-construction based on FIDIC Red Book condition for separated sewer network of Trogir city (25.000 PE). Client: Eko Kaštelanski zaljev, Split Completion year: 2009 |
PROJECTPreliminary design for reconstruction of the WWTP of City Samobor with EIA and design for Location Permit issuing. Project consisted of conceptual design, preliminary design, design for location permit issuing of the WWTP of City Samobor (44.000 PE) and EIA for sewer system and WWTP Samobor. Client: Hrvatske vode, Zagreb Completion year: 2000 |
PROJECTSewer system of Osijek, phase I and II. Analysis of the existing sewer system based on the hydro-dynamic mathematical model and conducted monitoring, Osijek sewer system master plan including technical-economical analysis of the proposed solution versions. Client: Vodovod Osijek, Osijek Completion year: 2003 |
PROJECTOptimization of the sewerage system of Zagreb city (POKS) – III phase. Client: Vodoopskrba i odvodnja Zagreb Completion year: 2005 |
PROJECTOptimization of the sewerage system of Zagreb city (POKS) – II phase. Client: City office for the development of Zagreb city Completion year: 1998 |
PROJECTOptimization of the sewerage system of Zagreb city (POKS) – I phase. Client: City office for the development of Zagreb city Completion year: 1996 |
![]() |
Declaration |
---|
![]() |
RECONECT project leaflet |
---|
PRONING DHI Ltd. for design, services and trade
Headquarters:
Račkoga 3, 10000 Zagreb, Croatia
Zagreb Office:
Otona Kučere 5, 10000 Zagreb, Croatia
tel. (+385 1) 455-6903, 461-0903, 461-0904
fax. (+385 1) 455-6904
Split Office:
Vukovarska 7, 21000 Split, Croatia
tel. (+385 21) 343-520
fax. (+385 21) 480-114
E-mail: info@proning-dhi.hr